Snohomish County PUD
Darrington Community Microgrid
In partnership with Snohomish PUD, this team developed multiple microgrid designs that aim to reduce utility costs and provide outage support for the critical loads of the remote community of Darrington, WA. HOMER PRO and Helioscope were utilized to recommend optimized battery and solar array sizes. Additionally, design aspects were developed for a microcontroller that maintains system stability between changing operation modes and worst-case scenarios. While designs supporting existing load profiles were technically viable, their associated costs were exorbitant enough that the team also designed and recommended a full HVAC retrofit, enabling a significantly more cost-effective microgrid solution.
Faculty Adviser(s)
June Lukuyu, Bioengineering
Related News
Elevating emerging engineers
The Industry Capstone Program partners UW Engineering students with sponsor organizations to devise innovation solutions to real-world problems.
Capstone collaboration leads to award
An ME capstone team received first place for its energy audit of the UW School of Social Work building.
Capstone creations
Students displayed innovative capstone design projects at the 2025 expo.