Skip to main content

Snohomish County PUD

Darrington Community Microgrid

In partnership with Snohomish PUD, this team developed multiple microgrid designs that aim to reduce utility costs and provide outage support for the critical loads of the remote community of Darrington, WA. HOMER PRO and Helioscope were utilized to recommend optimized battery and solar array sizes. Additionally, design aspects were developed for a microcontroller that maintains system stability between changing operation modes and worst-case scenarios. While designs supporting existing load profiles were technically viable, their associated costs were exorbitant enough that the team also designed and recommended a full HVAC retrofit, enabling a significantly more cost-effective microgrid solution.

Faculty Adviser(s)

June Lukuyu, Bioengineering

Related News

Industry capstone team standing inside elevator

Elevating emerging engineers

The Industry Capstone Program partners UW Engineering students with sponsor organizations to devise innovation solutions to real-world problems.

Five students in front of their poster at the capstone expo.

Capstone collaboration leads to award

An ME capstone team received first place for its energy audit of the UW School of Social Work building.

People examining a table with mechanical prototypes and a laptop at an exhibition.

Capstone creations

Students displayed innovative capstone design projects at the 2025 expo.