Automation of Chemical Ortho-Phosphate Removal at the Arlington WWTF
The project addressed a need to reduce the amount of chemicals used to remove phosphorus at the Arlington Wastewater Treatment Plant. Although the plant already removed most phosphorus through its normal treatment process, it still relied on alum to keep phosphorus levels within permit limits when wastewater conditions changed. The work was intended to explore an automated control approach that could better adjust chemical dosing at key points in the plant using existing equipment and operating data. Planned outputs included a technical memo, preliminary process drawings, and a cost analysis to help assess potential operational improvements and savings.
Faculty Adviser(s)
David Beck, Chemical Engineering
Related News
Elevating emerging engineers
The Industry Capstone Program partners UW Engineering students with sponsor organizations to devise innovation solutions to real-world problems.
Capstone collaboration leads to award
An ME capstone team received first place for its energy audit of the UW School of Social Work building.
Capstone creations
Students displayed innovative capstone design projects at the 2025 expo.