Skip to main content

BHC Consultants

Automation of Biological Nutrient Removal at the Mukilteo WWTF

The project addressed a need to reduce nitrogen in the final discharge stream at the Mukilteo Wastewater Treatment Plant by aiming to develop an automated controls strategy for secondary treatment. Using current and historical biological treatment data, the work was intended to develop a calibrated process model and evaluate control approaches that could fit within the plant’s existing infrastructure. The project aimed to produce a technical memo, preliminary process and instrumentation drawings, and a cost analysis to help assess potential operational improvements and savings.

Faculty Adviser(s)

David Beck, Chemical Engineering

Related News

Industry capstone team standing inside elevator

Elevating emerging engineers

The Industry Capstone Program partners UW Engineering students with sponsor organizations to devise innovation solutions to real-world problems.

Five students in front of their poster at the capstone expo.

Capstone collaboration leads to award

An ME capstone team received first place for its energy audit of the UW School of Social Work building.

People examining a table with mechanical prototypes and a laptop at an exhibition.

Capstone creations

Students displayed innovative capstone design projects at the 2025 expo.