BHC Consultants
Automation of Biological Nutrient Removal at the Mukilteo WWTF
The project addressed a need to reduce nitrogen in the final discharge stream at the Mukilteo Wastewater Treatment Plant by aiming to develop an automated controls strategy for secondary treatment. Using current and historical biological treatment data, the work was intended to develop a calibrated process model and evaluate control approaches that could fit within the plant’s existing infrastructure. The project aimed to produce a technical memo, preliminary process and instrumentation drawings, and a cost analysis to help assess potential operational improvements and savings.
Students
Faculty Adviser(s)
David Beck, Chemical Engineering
Related News
Mon, 10/13/2025 | UW Mechanical Engineering
Capstone collaboration leads to award
An ME capstone team received first place for its energy audit of the UW School of Social Work building.
Mon, 07/07/2025 | UW Mechanical Engineering
Capstone creations
Students displayed innovative capstone design projects at the 2025 expo.
Fri, 09/20/2024 | UW Civil & Environmental Engineering
Smarter irrigation for a greener UW
A new project combines satellite data with ground sensors to conserve water and create a more sustainable campus environment.
Mon, 09/09/2024 | UW Mechanical Engineering
Testing an in-home mobility system
Through innovative capstone projects, engineering students worked with community members on an adaptable mobility system.