Skip to main content

AIWaysion

AI Video Analytics for Multimodal Traffic Safety and Design Countermeasures at Burke-Gilman Trail Crossings

This project develops an AI video analytics pipeline to quantify safety risks at the NW 43rd St and 8th Ave NW intersection in Seattle's Ballard neighborhood, where the Burke Gilman Trail crosses local streets. Sponsored by AIWaysion, the system integrates YOLO26 detection, BoT SORT tracking, CVAT based labeling, homography calibration, and short horizon trajectory prediction to compute time to collision and post encroachment time metrics. Outputs include conflict heatmaps and evidence based countermeasure recommendations for City of Seattle stakeholders to support data driven roadway safety decisions.

Faculty Adviser(s)

Payman Arabshahi, Electrical & Computer Engineering

Related News

Industry capstone team standing inside elevator

Elevating emerging engineers

The Industry Capstone Program partners UW Engineering students with sponsor organizations to devise innovation solutions to real-world problems.

Five students in front of their poster at the capstone expo.

Capstone collaboration leads to award

An ME capstone team received first place for its energy audit of the UW School of Social Work building.

People examining a table with mechanical prototypes and a laptop at an exhibition.

Capstone creations

Students displayed innovative capstone design projects at the 2025 expo.