Skip to main content

Bechtel

Marine Levee Design and Construction

Bechtel needed a reliable perimeter levee concept for a new industrial facility planned on a low-lying marsh site with difficult geotechnical and hydrological conditions and a high risk of flooding. The work focused on developing a 10,000-foot levee design in accordance with U.S. Army Corps of Engineers guidance, along with a construction sequence and supporting documentation for field execution. The proposed capability included levee layout and typical cross sections sized to address elevation, slope, settlement, factor of safety, design life, mitigation measures, cost considerations, and owner requirements. It also defined construction staging, inspection hold points, and weather-related considerations, and incorporated sediment and erosion control features to support Stormwater Pollution Prevention compliance. Together, these materials were intended to provide a buildable levee concept, clarify construction constraints and maintenance considerations, and enable the site to be protected from flooding before further facility construction proceeded.

Faculty Adviser(s)

Steve Muench, Civil & Environmental Engineering

Related News

Industry capstone team standing inside elevator

Elevating emerging engineers

The Industry Capstone Program partners UW Engineering students with sponsor organizations to devise innovation solutions to real-world problems.

Five students in front of their poster at the capstone expo.

Capstone collaboration leads to award

An ME capstone team received first place for its energy audit of the UW School of Social Work building.

People examining a table with mechanical prototypes and a laptop at an exhibition.

Capstone creations

Students displayed innovative capstone design projects at the 2025 expo.