Molecular Engineering & Sciences Building Photos
Vertical Panorama, November 11, 2010
A vertical panorama from the from the 4th floor on the top to the subgrade level (SG) on the bottom. The photos are looking south in the tower corridors Thursday, November 11. Photos by John Stamets.
Level 4
Level 3
Level 2
Level 1
Level G
Level SGMolE Building Slide Shows
most recent first
Vertical Panorama (07/14/2011)
Construction (5/7/11 -)
Vertical Panorama (3/30/2011)
Construction (3/2 - 5/7/11)
Vertical Panorama (1/17/2011)
Construction (1/5 - 3/7/2011)
Radiant Floor Heating (12/2010)
Construction (11/4 - 12/20/2010)
Vertical Panorama (12/11/2010)
Vertical Panorama (11/11/2010)
UW Grids Explained (10/30/2010)
Construction (9/15 - 10/20/2010)
Vertical Panorama (9/17/2010)
The Aluminum Room (7/24 - 9/9/2010)
Vertical Panorama (8/31/2010)
Construction (7/20 - 8/23/2010)
Construction (5/27 - 7/19/2010)
Construction (5/1 - 5/21/2010)
Ground Level Goes Up (4/16 - 4/26/2010)
Sub-grade Level Takes Shape (3/24 - 4/13/2010)
Conduit, Foundation, and Drainage (2/16 - 3/24/2010)
Construction Begins (12/11/2009 - 2/8/2010)
Groundbreaking (10/9/2009)
Moving Cunningham Hall (9/8 - 10/1/2009)