Molecular Engineering & Sciences Building Photos
Vertical Panorama, March 30, 2011
A vertical panorama from the from the 4th to the 1st floors, looking southwest from near the north stairwell landings. Photos by John Stamets.

MolE Building Slide Shows
most recent first
Vertical Panorama (07/14/2011)
Construction (5/7/11 -)
Vertical Panorama (3/30/2011)
Construction (3/2 - 5/7/11)
Vertical Panorama (1/17/2011)
Construction (1/5 - 3/7/2011)
Radiant Floor Heating (12/2010)
Construction (11/4 - 12/20/2010)
Vertical Panorama (12/11/2010)
Vertical Panorama (11/11/2010)
UW Grids Explained (10/30/2010)
Construction (9/15 - 10/20/2010)
Vertical Panorama (9/17/2010)
The Aluminum Room (7/24 - 9/9/2010)
Vertical Panorama (8/31/2010)
Construction (7/20 - 8/23/2010)
Construction (5/27 - 7/19/2010)
Construction (5/1 - 5/21/2010)
Ground Level Goes Up (4/16 - 4/26/2010)
Sub-grade Level Takes Shape (3/24 - 4/13/2010)
Conduit, Foundation, and Drainage (2/16 - 3/24/2010)
Construction Begins (12/11/2009 - 2/8/2010)
Groundbreaking (10/9/2009)
Moving Cunningham Hall (9/8 - 10/1/2009)