You are here

» Molecular Engineering & Sciences Building Slide Show
Bookmark and Share

Molecular Engineering & Sciences Building Slide Show

Foundation, Conduit, and Drainage

first   prev1 of 17next   last
February 16, 2010. Conduit laid out for carrying power to an eventual Phase II building. Note the brown structural fill atop the tiered layers of glacial till. Photo by John Stamets.

Molecular Engineering & Sciences Building main page »

MolE Building Slide Shows

most recent first

Vertical Panorama (07/14/2011)

Construction (5/7/11 -)

Vertical Panorama (3/30/2011)

Construction (3/2 - 5/7/11)

Vertical Panorama (1/17/2011)

Construction (1/5 - 3/7/2011)

Radiant Floor Heating (12/2010)

Construction (11/4 - 12/20/2010)

Vertical Panorama (12/11/2010)

Vertical Panorama (11/11/2010)

UW Grids Explained (10/30/2010)

Construction (9/15 - 10/20/2010)

Vertical Panorama (9/17/2010)

The Aluminum Room (7/24 - 9/9/2010)

Vertical Panorama (8/31/2010)

Construction (7/20 - 8/23/2010)

Construction (5/27 - 7/19/2010)

Construction (5/1 - 5/21/2010)

Ground Level Goes Up (4/16 - 4/26/2010)

Sub-grade Level Takes Shape (3/24 - 4/13/2010)

Conduit, Foundation, and Drainage (2/16 - 3/24/2010)

Construction Begins (12/11/2009 - 2/8/2010)

Groundbreaking (10/9/2009)

Moving Cunningham Hall (9/8 - 10/1/2009)

Time Lapse Video

MolES Building construction in 48 seconds (YouTube):
time lapse construction video

See also other MolES time lapse construction videos.