You are here

» Molecular Engineering & Sciences Building Slide Show
Bookmark and Share

Molecular Engineering & Sciences Building Slide Show

Moving Cunningham Hall

first   prev1 of 6next   last
September 6, 2009. Preparing Cunningham Hall for relocation. Photo by John Stamets.

Molecular Engineering & Sciences Building main page »

MolE Building Slide Shows

most recent first

Vertical Panorama (07/14/2011)

Construction (5/7/11 -)

Vertical Panorama (3/30/2011)

Construction (3/2 - 5/7/11)

Vertical Panorama (1/17/2011)

Construction (1/5 - 3/7/2011)

Radiant Floor Heating (12/2010)

Construction (11/4 - 12/20/2010)

Vertical Panorama (12/11/2010)

Vertical Panorama (11/11/2010)

UW Grids Explained (10/30/2010)

Construction (9/15 - 10/20/2010)

Vertical Panorama (9/17/2010)

The Aluminum Room (7/24 - 9/9/2010)

Vertical Panorama (8/31/2010)

Construction (7/20 - 8/23/2010)

Construction (5/27 - 7/19/2010)

Construction (5/1 - 5/21/2010)

Ground Level Goes Up (4/16 - 4/26/2010)

Sub-grade Level Takes Shape (3/24 - 4/13/2010)

Conduit, Foundation, and Drainage (2/16 - 3/24/2010)

Construction Begins (12/11/2009 - 2/8/2010)

Groundbreaking (10/9/2009)

Moving Cunningham Hall (9/8 - 10/1/2009)

Web Camera

Check on construction progress right from your desk.

image from web cam
go to web cam page

The web cam is mounted on the 7th floor of the Atmospheric Sciences-Geophysics Building. Time-lapse movies are also available.