Molecular Engineering & Sciences Building Slide Show

The Aluminum Room

first   prev1 of 10next   last
Plywood was installed in the Electrical/Transformer room on Level SG to serve as a base for aluminum sheathing. This will shield scientific instrumentation in the rest of the building from the electromagnetic fields (EMF) produced by the transformers and other electrical equipment. Photo by John Stamets 07/24/10

MolE Building Slide Shows

most recent first

Vertical Panorama (07/14/2011)

Construction (5/7/11 -)

Vertical Panorama (3/30/2011)

Construction (3/2 - 5/7/11)

Vertical Panorama (1/17/2011)

Construction (1/5 - 3/7/2011)

Radiant Floor Heating (12/2010)

Construction (11/4 - 12/20/2010)

Vertical Panorama (12/11/2010)

Vertical Panorama (11/11/2010)

UW Grids Explained (10/30/2010)

Construction (9/15 - 10/20/2010)

Vertical Panorama (9/17/2010)

The Aluminum Room (7/24 - 9/9/2010)

Vertical Panorama (8/31/2010)

Construction (7/20 - 8/23/2010)

Construction (5/27 - 7/19/2010)

Construction (5/1 - 5/21/2010)

Ground Level Goes Up (4/16 - 4/26/2010)

Sub-grade Level Takes Shape (3/24 - 4/13/2010)

Conduit, Foundation, and Drainage (2/16 - 3/24/2010)

Construction Begins (12/11/2009 - 2/8/2010)

Groundbreaking (10/9/2009)

Moving Cunningham Hall (9/8 - 10/1/2009)

Time Lapse Video

MolES Building construction in 48 seconds (YouTube):
time lapse construction video

See also other MolES time lapse construction videos.