You are here

» Molecular Engineering & Sciences Building Slide Show
Bookmark and Share

Molecular Engineering & Sciences Building Slide Show

Construction Photos, 9/15/2010–10/20/2010

first   prev1 of 24next   last
Framing about half way up for a glass enclosed stairwell (Stair One) that will go from the plaza to the roof. The green board marks the elevator shaft. Photo by John Stamets 09/15/2010

MolE Building Slide Shows

most recent first

Vertical Panorama (07/14/2011)

Construction (5/7/11 -)

Vertical Panorama (3/30/2011)

Construction (3/2 - 5/7/11)

Vertical Panorama (1/17/2011)

Construction (1/5 - 3/7/2011)

Radiant Floor Heating (12/2010)

Construction (11/4 - 12/20/2010)

Vertical Panorama (12/11/2010)

Vertical Panorama (11/11/2010)

UW Grids Explained (10/30/2010)

Construction (9/15 - 10/20/2010)

Vertical Panorama (9/17/2010)

The Aluminum Room (7/24 - 9/9/2010)

Vertical Panorama (8/31/2010)

Construction (7/20 - 8/23/2010)

Construction (5/27 - 7/19/2010)

Construction (5/1 - 5/21/2010)

Ground Level Goes Up (4/16 - 4/26/2010)

Sub-grade Level Takes Shape (3/24 - 4/13/2010)

Conduit, Foundation, and Drainage (2/16 - 3/24/2010)

Construction Begins (12/11/2009 - 2/8/2010)

Groundbreaking (10/9/2009)

Moving Cunningham Hall (9/8 - 10/1/2009)

Time Lapse Video

MolES Building construction in 48 seconds (YouTube):
time lapse construction video

See also other MolES time lapse construction videos.