You are here

» Molecular Engineering & Sciences Building Slide Show
Bookmark and Share

Molecular Engineering & Sciences Building Slide Show

Construction Photos, July 20, 2010–

first   prev1 of 24next   last
July 20, 2010. Looking southeast on Level G; shows the skylight structure along the 'Future Labs' corridor below the plaza. The skylight runs only half the length of this corridor, near the eastern edge of the plaza.

MolE Building Slide Shows

most recent first

Vertical Panorama (07/14/2011)

Construction (5/7/11 -)

Vertical Panorama (3/30/2011)

Construction (3/2 - 5/7/11)

Vertical Panorama (1/17/2011)

Construction (1/5 - 3/7/2011)

Radiant Floor Heating (12/2010)

Construction (11/4 - 12/20/2010)

Vertical Panorama (12/11/2010)

Vertical Panorama (11/11/2010)

UW Grids Explained (10/30/2010)

Construction (9/15 - 10/20/2010)

Vertical Panorama (9/17/2010)

The Aluminum Room (7/24 - 9/9/2010)

Vertical Panorama (8/31/2010)

Construction (7/20 - 8/23/2010)

Construction (5/27 - 7/19/2010)

Construction (5/1 - 5/21/2010)

Ground Level Goes Up (4/16 - 4/26/2010)

Sub-grade Level Takes Shape (3/24 - 4/13/2010)

Conduit, Foundation, and Drainage (2/16 - 3/24/2010)

Construction Begins (12/11/2009 - 2/8/2010)

Groundbreaking (10/9/2009)

Moving Cunningham Hall (9/8 - 10/1/2009)

Time Lapse Video

MolES Building construction in 48 seconds (YouTube):
time lapse construction video

See also other MolES time lapse construction videos.