Molecular Engineering Building Slide Show

Construction Photos, May 1-21, 2010

first   prev1 of 16next   last
May 1, 2010. Electric power enters the building at the SW corner, covered with concrete sprinkled with permanent red dye powder. The red warns anyone digging here in the future that power cables are underneath. Photo by John Stamets.

Molecular Engineering Building main page »

MolE Building Slide Shows

most recent first

Vertical Panorama (07/14/2011)

Construction (5/7/11 -)

Vertical Panorama (3/30/2011)

Construction (3/2 - 5/7/11)

Vertical Panorama (1/17/2011)

Construction (1/5 - 3/7/2011)

Radiant Floor Heating (12/2010)

Construction (11/4 - 12/20/2010)

Vertical Panorama (12/11/2010)

Vertical Panorama (11/11/2010)

UW Grids Explained (10/30/2010)

Construction (9/15 - 10/20/2010)

Vertical Panorama (9/17/2010)

The Aluminum Room (7/24 - 9/9/2010)

Vertical Panorama (8/31/2010)

Construction (7/20 - 8/23/2010)

Construction (5/27 - 7/19/2010)

Construction (5/1 - 5/21/2010)

Ground Level Goes Up (4/16 - 4/26/2010)

Sub-grade Level Takes Shape (3/24 - 4/13/2010)

Conduit, Foundation, and Drainage (2/16 - 3/24/2010)

Construction Begins (12/11/2009 - 2/8/2010)

Groundbreaking (10/9/2009)

Moving Cunningham Hall (9/8 - 10/1/2009)

Time Lapse Video

MolES Building construction in 48 seconds (YouTube):
time lapse construction video

See also other MolES time lapse construction videos.